Monday, July 5, 2010
Eleven AM
This is the view from the northern end. All doors will be removed and walls
will be built then windows and doors added.
This is the southern side. Holes to be cut for windows and the back door.
Next step: the internal walls will be removed as needed and holes to be cut for doors and windows to be installed.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
▼
2010
(19)
►
August
(2)
▼
July
(14)
The flooring goes in.The ply floor has been laid. ...
A lot has happened in the last two weeks. The roo...
The roof frame in place The east side, windows sti...
The windows going in . Kitchen, dining area wind...
The framework going into the containers Detail of...
The walls come outThe last part of the wall joi...
Eleven AM This is the view from the northern end. ...
The second container in place. The containers had...
First container in placeSecond container being un...
Stage Two of the Delivery
Footings for the containersDetail of footings rea...
Footings ready for concrete pour
Formwork for the footings and piersToday the conc...
►
June
(3)
About Me
jk@snow
View my complete profile
No comments:
Post a Comment